|
CONNECTICUT |
| Bridgeport
Metro Pop/18+ Size Contract Rot. Cycle Cost
Avg DEC/18+ Perm. Bulletins --- NON STD 6 Months N/A 8,000 0.0 / 0.0 Rotary Bulletins --- NON STD 12 Months 60 Days 6,000 82000.0 / 0.0 Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets --- --- 3-6/ 8,730 4-10/ 13,300 7-16/ 20,700 12-26/ 33,250 8-Sheets --- --- 5-0/ 1,750 10-0/ 3,250 15-0/ 4,725 20-0/ 6,000 Danbury Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets --- --- 1-2/ 3,000 2-4/ 5,850 3-6/ 8,730 4-8/ 11,580 Fairfield County Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets --- --- 8-7/ 14,250 14-15/ 26,100 17-27/ 37,400 20-37/ 45,600 Norwalk/ Bridgeport Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets --- --- 2-4/ 5,850 3-6/ 8,730 6-8/ 13,510 8-18/ 24,700 Hartford-Bristol Metro Pop/18+ Size Contract Rot. Cycle Cost Avg DEC/18+ Rotary Bulletins 1112.6/ 859.4 14 x 48 4 Months 60 Days 4,410 60.1 / 60.400002 Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets 1112.6/ 859.4 --- 9-15/ 18,118 16-30/ 34,729 23-45/ 51,334 32-60/ 69,457 Springfield Pop/18+ Size Contract Rot. Cycle Cost Avg DEC/18+ Rotary Bulletins 658.4/ 503.7 14 x 48 4 Months 60 Days 4,295 0.0 / 0.0 Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets 658.4/ 503.7 --- 6-7/ 10,765 13-15/ 22,085 20-22/ 34,785 26-29/ 45,656 Waterbury Pop/18+ Size Contract Rot. Cycle Cost Avg DEC/18+ Rotary Bulletins 220.0 14 x 48 4 Months 60 Days 2,636 37.1 / 37.5 |
For
Domain Information Contact Owner:
Richard Hussey on CONTACT
PAGE
Tech Help: BGID®
| Disclaimer | DickHussey.com & DIM
| Talk: GUM | ALL RIGHTS RESERVED