SOUTH DAKOTA
| Rapid City Pop/18+ Size Contract Rot. Cycle Cost Avg DEC/18+ |
Pop/18+ Size 25 GRP 50 GRP 75 GRP 100 GRP 30-Sheets 80.0 --- 0-3/ 1,410 0-6/ 2,820 0-8/ 3,760 0-10/ 4,700 Bench 80.0 --- 3-/ 120 6-/ 240 8-/ 320 10-/ 400 Bus 80.0 --- 0/ 0 0/ 0 0/ 0 1/ 75 Bus 80.0 --- 0/ 0 0/ 0 0/ 0 1/ 60 Bus 80.0 --- 0/ 0 0/ 0 0/ 0 1/ 175 |